You can build with quality, on time, even profitably — and still lose money.
Not because something went wrong on site, but because your finances remain out of control.
In construction, that’s a classic: the number of projects grows, turnover increases — but at the end of the month, the account is empty, contractors await payment, and the numbers don’t add up. The reason is simple: without structured financial management, a business doesn’t grow — it breaks down into chaotic processes.
What exactly isn’t working in your construction business finances — and how do you fix it?
Let’s look at three core problems that destroy profit and how to solve them.
.png)
Problem #1: No Detailed Tracking by Project
In construction, everything revolves around projects. You invest in materials, crews, equipment rental — often across multiple projects at once. But when you try to tally things up, the numbers don’t match. Revenue looks good, but the bank balance is zero.
Job costing — the allocation of costs to specific projects — is a basic tool for building real budgets, analyzing efficiency, and forecasting profitability.
Without project-based management, a business quickly becomes unmanageable:
- It’s hard to say how much a single project actually costs.
- Overruns and budgeting errors are impossible to catch.
- The business scales, but profitability declines.
- There’s no way to analyze margins and make informed decisions.
According to a study published on the MDPI portal:
25% of construction companies may face bankruptcy after just two or three poorly costed projects — due to underestimating labor or materials.
How Finmap Turns Chaos into a Controlled Process
In Finmap, you can manage financials by project and subproject — for example, track foundation, roofing, or interior costs separately within one site.
This allows you to see the financial picture not just across the business as a whole, but per project: where overruns occur, which sites are profitable, and which need budget revision.
The system lets you:
- Build a structure of projects and subprojects (e.g. site → subprojects: foundation, interiors, structural work, engineering, etc.).
- Automatically or manually assign and track transactions on the right level.
- Generate key reports — especially P&L and Projects, which provide deep financial analytics.



By aligning Finmap’s structure to your real business model, you go beyond tracking costs — you unlock real financial insights.
The system shows key performance metrics — both across the company and per project. Here are suggested benchmark metrics for construction businesses that Finmap helps you track:
Companies using analytics and job costing make decisions faster and more accurately: a research shows that implementing job costing allows 42% faster resource reallocation across projects, improving business agility.
With Finmap, you’re no longer flying blind — the system gives clear, project-specific data so profit becomes a result of management, not luck.
Problem #2: Cash Gaps in Construction — and How to Avoid Sudden Crises
In construction, cash flow gaps aren’t an exception, they’re the norm. You spend heavily upfront: advances to suppliers, prepayments to subcontractors, material purchases.
Income comes later — after completion or with delays.
Without smart financial management, this leads to:
- Cash gaps even in profitable companies.
- No visibility into upcoming financial strain.
- Delays in payments to vendors and employees.
- Loss of trust from contractors and internal teams.
According to Entrepreneur:
Up to 82% of construction businesses go bankrupt due to poor cash flow management — one of the most overlooked risk zones.
Finmap’s Solution: What Changes When a System Is in Place
Finmap doesn’t just show your account balances — it answers the key question: Will you have enough to meet your obligations in the coming weeks?
The core tool is the Payment Calendar, which tracks all upcoming income and expenses by day and giving you early warning of potential shortfalls.

The system lets you:
- Factor scheduled expenses into your financial projections.
- Track expected income (milestone payments, receivables).
- View cash movement by date, account, and project.
- Forecast cash flow and highlight risk periods.
Cash flow forecasts aren’t just reports, they’re early warning systems. Businesses that see what’s coming don’t react, they plan.
In Finmap, this tool works daily — to ensure money doesn’t disappear unexpectedly, but instead drives growth.
Problem #3: When No One Knows Who Owes What to Whom
In construction, financial obligations pile up fast: dozens of contractors, suppliers, advances, partial payments, petty cash.
Without systematic management, this data cannot be combined into a single picture and even the company's manager cannot accurately say how much money is “in circulation,” how much is actually available, and how much is tied up in debt.
Late payments are widespread. According to PYMNTs:
71% of construction subcontractors regularly face payment delays — often due to the lack of structured obligation tracking.
The consequences of disorderly accounts receivable and accounts payable that your business experiences every day:
- No control over receivables or payables.
- No view of real company liquidity.
- “Leaked” petty cash — with no clear trace or accountability.
- Irregular cash pressure, forcing last-minute transfers, credit usage, or personal funding.
Without obligation tracking, you’re not managing money — you’re chasing it. And the bigger the business, the bigger the chaos.
How Finmap Handles This in Real Business Scenarios
Finmap helps you systematically manage receivables and payables via dedicated reports and planning tools that recognize and reconcile operations.


All obligations — future and overdue — are collected in one system, linked to contractors and due dates. The Payment Calendar includes them in forecasts, so you see not just your balance — but the full picture: How much needs to be paid, when, to whom, and from what source.
Petty Cash Management in Construction: a Practical Fix
Petty cash is a “gray zone” in construction: site managers, supervisors, and buyers often receive cash or direct transfers for small purchases, logistics, or repairs.
Without a system, these funds often go untracked or are reported late. So you don’t know:
- What’s been spent.
- What’s still outstanding.
- What was never returned.
Common issues:
- No receipts, or they’re scattered in Viber / Telegram / private chats.
- Some expenses never get logged.
- The cash register “drops,” and no one’s accountable.
- At month-end, reconciling projects is impossible.
In Finmap, you can manage petty cash per employee — with amounts, purpose, project, and closure status
Here’s a step-by-step framework for gaining control:
If you think petty cash isn’t an issue, and trust alone is enough look at the data Business.com:
67% of employees have violated company expense rules at least once.
ACFE studies show that businesses lose up to 5% of revenue every month due to internal errors, abuse, or simple lack of control.
If your business makes $1,000,000/month — you’re losing $50,000 without even knowing it.
Now multiply that by 12, or 5 years, or 10.
Petty cash isn’t minor. It’s an invisible budget leak, one that grows unless closed systematically.
Finmap Client Case: How an Architect Became a Financial Manager
Bogdanova Bureau is an architecture studio handling full-cycle interior and building projects, with offices in Kyiv and Switzerland. Each project is highly individual with large budgets ($1M to $5M), and responsibility not just for design but for timelines, teams, phases, and costs.

In the early days, there was no structured financial management. Money was scattered across accounts, cards, and cashboxes. Some transactions weren’t logged, some costs went into Excel, some stayed in someone’s head.
Simple questions had no answers:
- How much did we earn?
- Can we cover payroll?
- Which project is profitable?
We’d finish a project — everyone got paid. But we were left with nothing. No money. And no idea where it went. - Olga Bogdanova, founder of Bogdanova Bureau
Things got critical when multiple projects went into the red — by $50K, $80K, even $180K. Reserves were drained. Cash gaps appeared. They had to take loans — but the company nearly collapsed.
That experience became a turning point.
Olga realized: without financial management, you don’t just lose profit — you lose control.
Learn how Olga decided to implement Finmap, built a new financial model, and grew revenue by +173%.
What changed after Finmap:
Today, Bogdanova Bureau handles fewer projects — but with bigger budgets. Financial management became the foundation for forecasting, strategic planning, and transforming the business model.
My team is a factory that produces projects. And I need to know exactly how much that factory costs — to be sure we’re earning, not just working to break even. - Olga Bogdanova, founder of Bogdanova Bureau
Now Olga has full clarity: where the profit is, where reserves lie, where growth is possible. The business shifted from manual operation to system-based management.
Finance isn’t about spreadsheets. It’s about choice, clarity, and the ability to act strategically.
Build Your Business on Numbers — Not Assumptions
In construction, every number matters — especially the ones you don’t see at first. Not having a financial system costs you: in time, stress, and money.
Finmap brings structure to the chaos:
- See project profitability;
- Prevent cash gaps;
- Track petty cash and debts;
- Delegate financial management confidently.
Don’t wait until the money runs out again — try Finmap today and take control.
With Finmap, you’re not just building sites — you’re building a profitable business.
Frequently Asked Questions
1. Why does construction need project-based accounting?
Because in construction, profitability isn’t about totals — it’s about how each site performs. Without job costing, you don’t see what’s eating margin, where the overruns are, or which project is in the red.
2. Why do even profitable companies face cash gaps?
Because profit ≠ cash. In construction, payments often come late, while expenses happen upfront. Without a payment calendar, it’s easy to have dozens of invoices due — and nothing in the account.
3. How to fix the chaos in contractor and supplier payments?
Structure your contractor data — amounts, terms, and due dates. Use Receivables and Payables reports in Finmap for a full picture of who owes what to whom. You’ll stop missing payments, avoid penalties, and build trust with partners and your team.
4. What about petty cash that always slips through the cracks?
Create separate accounts for foremen and buyers. Give them limited access via the mobile app or Telegram bot. Require receipts. Result: every expense gets logged, nothing gets lost, and your cash flow stays healthy.
5. What practical results can financial management deliver?
Look at Bogdanova Bureau. After adopting Finmap, they overcame cash gaps, optimized costs, revised their project model — and increased revenue by +173%. Financial management turned from a burden into a tool for growth.